Announcement

Collapse
No announcement yet.

New Road to Iran from Armenia

Collapse
X
 
  • Filter
  • Time
  • Show
Clear All
new posts

  • New Road to Iran from Armenia

    New Road to Iran from Armenia

    Persian Journal, Iran
    June 28 2005

    Armenian President Robert Kocharyan has approved project of
    construction of a new road to Iran passing by Shikahogh forest
    preserve, Minister of Transport and Communication of Armenia Andranik
    Manukyan told journalists today.

    He says the length of the road will total 96 km. Which is by 7 km
    longer, with the maximum height to be 2,160 meters as against 2,005
    meters of the project via the reserve. However, comparing the new
    project with the operative road to Iran, the minister pointed out
    the preferential differences of the new one.

    In particular, the slope of the new road will be an average of 5.8%
    against 8% of the operative road with the maximum tilt being 8%
    against present 14%. The smaller tilting will save $1.6 mln on fuel
    and $70,000 on exploitation. The new road will have no serpentines
    and its width will be 6.6 meters. Its maximum load will be 80 tons
    against present 36 tons.

    Manukyan says that the construction has already been started
    and the second road connecting Iran and Armenia - Kapan-
    Tsap-Shvanidzor-Shishkert-Meghri will be put into exploitation in
    2006. The cost of the project is 9.3 bln AMD will not be changed
    seriously.
Working...
X