DESIGN OF ARMENIA-GEORGIA HIGH-VOLTAGE LINE TO BE COMPLETED BY LATE 2006
Noyan Tapan
Oct 25 2006
YEREVAN, OCTOBER 25, NOYAN TAPAN. It is envisaged to complete the
design of the 400-kv high-voltage line from Georgia to Armenia by the
end of 2006, after which a tender to choose a construction organization
will be announced.
Karen Poghosian, architect of Grig Realty company that implements
the design work, told NT correspondent that the high-voltage line
will be 215-km long. The customer of the construction is Georgia's
Ministry of Energy.
Noyan Tapan
Oct 25 2006
YEREVAN, OCTOBER 25, NOYAN TAPAN. It is envisaged to complete the
design of the 400-kv high-voltage line from Georgia to Armenia by the
end of 2006, after which a tender to choose a construction organization
will be announced.
Karen Poghosian, architect of Grig Realty company that implements
the design work, told NT correspondent that the high-voltage line
will be 215-km long. The customer of the construction is Georgia's
Ministry of Energy.