Announcement

Collapse
No announcement yet.

Partial Repairs Done At "Erebuni" Preserve-Museum With 7 Million Dra

Collapse
X
 
  • Filter
  • Time
  • Show
Clear All
new posts

  • Partial Repairs Done At "Erebuni" Preserve-Museum With 7 Million Dra

    PARTIAL REPAIRS DONE AT "EREBUNI" PRESERVE-MUSEUM WITH 7 MILLION DRAMS ALLOCATED FROM STATE BUDGET

    Noyan Tapan
    April 10, 2008

    YEREVAN, APRIL 10, NOYAN TAPAN. Partial repair work is underway
    at Erebuni historical-acheological preserve-museum with 7 million
    drams (about 22 thousand USD) allocated from the RA state budget. In
    particular, the passage, lavatory, electric power lines of the fortress
    are being repaired, and it is envisaged to build a new water-pipe. The
    director of the preserve-museum Ashot Piliposian told NT correspondent
    that the design of repairs of the stronghold's wall is being done now.

    According to him, the repair work is a large-scale one and will be
    completed in 1-2 years. Besides, improvement of the preserve will start
    soon with the participation of students of the Faculty of History of
    Yerevan State University.

    A. Piliposian said that electromagnetic examination of the town
    district of the fortress will start in late April in order to find
    out if there are any undergroun structures in this section, and if so,
    how they are arranged. In his words, no excavations have been carried
    out in this site so the research will allow to determine the section
    of the fortress where excavatio can be done.
Working...
X