THE CAPITAL'S NEW ORDER OF WATERSUPPLY
Azat Artsakht Tert
Jan 24 2008
Nagorno Karabakh Republic
The problem of watersupply in NKR, particularly, in the capital,
has been always vulnerable. The heavy cold weather disclosed failure
of water-pipe and water netting, because of which a great part of
inhabitants has reached a deadlock.
At the conference, held on January21st by the President B.Sahakian,
the head of the country gave instructions, according to which all the
netting of watersupply should be changed with new one and should be
corresponded to the accepted norms and standarts.
According to the mayor of Stepanakert Vazgen Michaelian, the works
of change would refer to filter stations, reservoirs, the main
water-pipe coming from Ghaybalu, pipes of the capital's all water
netting. V. Michaelian noted, that for bringing quickly this order
to life, specialists have been already invited from Armenia and a
task have been set before them: to represent corresponding estimates
and designes in the shortest period of time. He noted also, that the
works followed by a designed stage would be realized by own efforts.
They would be controled by the state.
In his turn, the director of "Jrmough-Koyugh" CSJC V.Arzumanian noted,
that broadening of water system of the capital was foreseen.
Azat Artsakht Tert
Jan 24 2008
Nagorno Karabakh Republic
The problem of watersupply in NKR, particularly, in the capital,
has been always vulnerable. The heavy cold weather disclosed failure
of water-pipe and water netting, because of which a great part of
inhabitants has reached a deadlock.
At the conference, held on January21st by the President B.Sahakian,
the head of the country gave instructions, according to which all the
netting of watersupply should be changed with new one and should be
corresponded to the accepted norms and standarts.
According to the mayor of Stepanakert Vazgen Michaelian, the works
of change would refer to filter stations, reservoirs, the main
water-pipe coming from Ghaybalu, pipes of the capital's all water
netting. V. Michaelian noted, that for bringing quickly this order
to life, specialists have been already invited from Armenia and a
task have been set before them: to represent corresponding estimates
and designes in the shortest period of time. He noted also, that the
works followed by a designed stage would be realized by own efforts.
They would be controled by the state.
In his turn, the director of "Jrmough-Koyugh" CSJC V.Arzumanian noted,
that broadening of water system of the capital was foreseen.