Announcement

Collapse
No announcement yet.

Reconstruction Of Rural Roads To Start In 4 Armenian Marzes In Comin

Collapse
X
 
  • Filter
  • Time
  • Show
Clear All
new posts

  • Reconstruction Of Rural Roads To Start In 4 Armenian Marzes In Comin

    RECONSTRUCTION OF RURAL ROADS TO START IN 4 ARMENIAN MARZES IN COMING DAYS

    Noyan Tapan
    http://www.nt.am/news.php?shownews=117189
    Se p 9, 2008

    YEREVAN, SEPTEMBER 9, NOYAN TAPAN. On Septemer 8 the RA National
    Assembly ratified the agreement signed in 2006-2007 between the RA
    ministry of finance and economy and the Asian Development Bank on
    small-scale technical assistance for organization of a feasibility
    study on the rural road reconstruction program. According to the
    RA minister of transport and communication Gurgen Sargsian, the
    small-scale technical assistance amounts to 150 thousand dollars.

    During a talk with NT correspondent, G. Sargsian said that the major
    credit program financed by the Asian Development Bank envisages repairs
    of a total of 220 km of 10 roads in Kotayk, Ararat, Gegharkunik and
    Armavir marzes. The amount of the main credit makes 30.6 million
    dollars.

    The Asian Development Bank hired an advisor who has done preparatory
    work on the credit allocation and the technical task of the rural
    road reconstruction program, as a result of which the indicated road
    sections have been included in the major credit program financed by
    the bank. An additional sum of 150 thousand dollars has been allocated
    as a second technical assistance, thanks to which the design work
    for reconstruction of these roads was implemented.

    The minister said that the implementation of the program will be
    launched in the coming days, immediately after the start of the
    financing. The main stages of the program's preparation have been
    completed. There are some small technical problems that are being
    agreed on with the Asian Development Bank at the moment. It is
    planned to repair 109 km of road sections at the first stage of the
    program. The program is envisaged to finish in 2010.
Working...
X