Announcement

Collapse
No announcement yet.

Hrazdan Faces The Prospect Of A New 'Ore Mining Disaster'

Collapse
X
 
  • Filter
  • Time
  • Show
Clear All
new posts

  • Hrazdan Faces The Prospect Of A New 'Ore Mining Disaster'

    HRAZDAN FACES THE PROSPECT OF A NEW 'ORE MINING DISASTER'

    arminfo
    Friday, June 24, 14:16

    While people of Hrazdan were struggling to ban the extraction of
    Hrazdan iron mine, information appeared in the press that only 15
    km far away from the city of Hrazdan an enrichment plant of gold
    extraction and tailings dump would we built and that the plant
    construction project had gone through expertise long ago, EcoLur
    reports.

    Hrazdan is famous for its polluted air basin. In Hrazdan the maximum
    concentration of cement dust STK caused by only the Cement factory
    emissions can exceed 6-8 times. Besides the Cement factory the Hrazdan
    TTP functions in Hruzdan, they intend to open the iron mine in the
    city centre and now the gold extraction plant and tailings dump are
    initiated. And the plant construction project states that one of the
    favourable factors of creating the new plant is "the great ecological
    potential of the territory".

    The plant is going to recycle the gold containing ore in Lusajur mine.

    The ore extraction license belongs to "Paramount gold mining" Ltd.

    100 thousand ore will be recycled per year. The workshops of scrapping
    and grinding will be placed outside.

    According to the project the whole territory of the enrichment plant
    and tailings dump is 4.6 ha. "The tails belong to not dangerous class,
    aren't flammable, explosive and dissolving", states the project,
    consequently the fee is "0.0 dram".

    Among the pollutants of the atmosphere are dust, sulfur dioxide and
    carbon monoxide.

    The demand for fresh water in the plant will be 63.180 m3.




    From: A. Papazian
Working...
X