HAYASTAN ALL-ARMENIAN FUND IS RECONSTRUCTING STEPANAKERT'S INTERNAL WATER NETWORK 10TH AND 11TH ZONES
Noyan Tapan
09.11.2011
The Stepanakert water supply network, comprised of 13 zones with an
overall length of 140 km, was built in 1950s. Due to the poor state
of the water-pipes significant loss of water was in place. After the
reconstruction the residential blocks within the area will receive
regular water supply.
Sponsored by -Telethon 2010 and Nagorno-Karabakh government
Responsible for the project - Gagik Nazaryan, Hakob Gyulgyulyan
Noyan Tapan
09.11.2011
The Stepanakert water supply network, comprised of 13 zones with an
overall length of 140 km, was built in 1950s. Due to the poor state
of the water-pipes significant loss of water was in place. After the
reconstruction the residential blocks within the area will receive
regular water supply.
Sponsored by -Telethon 2010 and Nagorno-Karabakh government
Responsible for the project - Gagik Nazaryan, Hakob Gyulgyulyan