Announcement

Collapse
No announcement yet.

Railway Line To "Zvartnots" Airport Can Be Built In A Year

Collapse
X
 
  • Filter
  • Time
  • Show
Clear All
new posts

  • Railway Line To "Zvartnots" Airport Can Be Built In A Year

    RAILWAY LINE TO "ZVARTNOTS" AIRPORT CAN BE BUILT IN A YEAR

    ARMENPRESS
    24 May, 2012
    YEREVAN

    YEREVAN, MAY 24, ARMENPRESS: The building of railway line from metro
    "Charbakh" station to "Zvatrnots" international airports" can be
    implemented in a year. Armenpress reports that about this declared
    Director General of CJSC "South Caucasus railway" Victor Rebets during
    the press conference on May 24. In his words at present the preparation
    of program's design-pre-calculation documents is in process in result
    of which will be done the total calculation of necessary costs.

    The length of main projected railway is 7800 meters, from which 5350
    meters are to be built. It is also planned to build 850 meters long
    railway tunnel.

    The implementation of the project will give the opportunity to join
    the passenger terminal of the airport with railway line to metro
    "Charbakh" station and cargo terminal with "Karmir blur" station.


    From: Baghdasarian
Working...
X