Announcement

Collapse
No announcement yet.

Yerevan Street Lighting Project

Collapse
X
 
  • Filter
  • Time
  • Show
Clear All
new posts

  • Yerevan Street Lighting Project

    TendersInfo - Project Notices
    March 7, 2015 Saturday


    Yerevan Street Lighting Project



    Business sector:Municipal and environmental infrastructure
    Notice type:Public
    Environmental category:B
    Target board date:06 May 2015
    PSD disclosed:06 Mar 2015

    Project description and objectives : The EBRD is considering financing
    a project aimed at the rehabilitation and modernisation of the street
    lighting network in the Armenian capital city, Yerevan. The key
    project components include 80 km of underground cabling in primary and
    secondary streets, the replacement of existing lighting fixtures with
    modern, energy efficient technology, and the installation of a central
    lighting-management system with automated control and energy
    monitoring.


    The proceeds of the EBRD loan will finance a pilot project to
    refurbish the street lighting network of 28 streets in Yerevan.
    Transition impact :


    1. Successful private sector participation and institutional strengthening:
    The Project will be contracted on a design-install-maintain basis by
    the company selected following a transparent tendering process. The
    winning bidder will need to present energy saving targets, carry out
    the equipment installation and ensure a multi-year performance
    guarantee for the installed solution.
    2. Demonstration of new replicable behaviours/skills related to the
    introduction of the best available technology:
    The Project includes the introduction of advanced sustainable energy
    techniques, compliant with international best practice. The reduction
    in the use of mercury-based lighting fixtures will reduce
    environmental hazards at landfills. Better illumination of the Yerevan
    streets will improve road safety, potentially reduce crime rates and
    contribute to improving social behaviour in the city.
    Transition benchmarks include:


    (i) replication of LED-based street lighting solutions in at least two other
    municipalities in the country, or in the wider Caucasus region if necessary to
    find sufficiently large municipalities.
    (ii) replication of multi-year performance-based street lighting
    contracting to the private sector in at least two other municipalities
    in the country or in the wider Caucasus region if necessary to find
    sufficiently large municipalities.
    Expected transition impact rating
    Moderate/Good with Medium Risk
    The client : The Borrower will be the Republic of Armenia.
    Implementation of the investment will be the responsibility of Yerevan
    Municipality s Street Lighting Company.
    EBRD finance : A sovereign loan of up to US$ 4 million to be
    complemented by a grant component of up to US$ 2 million to be funded
    by an international donor (exact source to be confirmed).

    Total project cost : The total project cost is estimated to be up to
    US$ 7 million including technical cooperation.
    Environmental and social categorisation, impact, and
    mitigation : The proposed Project has been categorised B in accordance
    with the 2014 EBRD Environmental and Social (E&S) Policy, as the
    potential impacts are expected to be site-specific, readily i
    Project completion date : 2016-12-31 12:00:00
    Major organization : REPUBLIC OF ARMENIA

    Address : Armenia

    Country :Armenia
    Financier : European Bank for Reconstruction and Development (EBRD),

    Financier address : European Bank for Reconstruction and Development (EBRD)


    One Exchange Square
    London EC2A 2JN
    United Kingdom


    Website : http://www.ebrd.com /
    Tel: +44 20 7338 6794
    Fax: +44 20 7338 7472
    Email: [email protected]

Working...
X