    RESULTS OF AMULSAR GOLD MINING DOCUMENT STUDY RESULTS: CONCLUSIONS AND PROPOSALS

    15:27 March 23, 2015

    EcoLur

    Specialists give professional assessment to Amulsar open pit mining
    project implemented by Lydian International Company in Armenia with
    the financial support of the European Bank for Reconstruction and
    Development, EBRD, and International Finance Corporation, IFC.

    This time it's Harutyun Movsisyan, PhD in Geological Sciences,
    Associate Professor, who submitted his assessment on the official
    website of Aarhus Centers, www.aarhus.am, which particularly says:
    "The EIA submitted by the company mentions heap leach facility with
    a capacity of 106 million tons and says nothing that this volume is
    wastes to be collected in the tailing dump, which needs technical
    conditions, special project, hazard category and a passport. It
    mentions only the area and nothing about fencing etc. The project
    excludes penetration of hazardous substances (note by EcoLur: gold
    extraction with cyanide) into environment and doesn't plan to locate
    recording detectors below the protecting layer. Only these devices
    can fix any leak to take measures against.

    The next problem is the seismic assessment of Amulsar project area.

    The EIA mentions middle extent of seismic risks, while the section on
    a heap leach facility doesn't mention seismicity at all. A question
    arises: how seismicity can be assessed, if the technical proposal
    on facility construction is missing and compliance with technical
    standards is missing. We speak about seismicity of 5-6 magnitude,
    which is underestimated assessment for this region. Amulsar is located
    in the seismic zone within the ranges of 0.2-0.3 g and higher, which
    can be interpreted as 8-9 magnitude seismicity.

    The project mentions about the wastes and barren rock, which will
    be accumulated after open pit, but it forgets about the heap leach
    facility located in a distance of 1.2 km from Gndevaz Village and
    adsorption-desorption-recovery (ADR) plant. The sanitary zone is
    calculated in a distance of 1.5 km from the nearest house, which is
    incorrect. Sanitary zone is determined as 1 km from buffer zone, which
    separates residential area from the zone of business activities. Under
    the international standards, this distance is 2 km from the buffer
    zone, so the plant must be relocated in a distance of 3 km from the
    residential area.

    Then what about rationality. Under the project, dead pits will be
    filled with barren rock. But the data show that at the depth of 50-100
    meters ores are available, while according to RA Code on Subsoil, the
    development of the mine is permitted, if absence of further resources
    is proved. Nevertheless, the project doesn't mention anything about
    expected resources of expansion, reclaiming plans and waste generation
    and disposal limits project, i.e. expected resources and balance are
    subject to state assessment."

    http://ecolur.org/en/news/mining/results-of-amulsar-gold-mining-document-study-results-conclusions-and-proposals/7144/