Announcement

Collapse
No announcement yet.

The Transit Railway Bridge Will Be Recovered In 1-2 Weeks

Collapse
X
 
  • Filter
  • Time
  • Show
Clear All
new posts

  • The Transit Railway Bridge Will Be Recovered In 1-2 Weeks

    THE TRANSIT RAILWAY BRIDGE WILL BE RECOVERED IN 1-2 WEEKS

    armradio.am
    20.08.2008 16:48

    The transit railway bridge, which was bombarded in August 16, is being
    recovered in Georgia for soon transportation of cargos. The transit
    railway bridge has not been used for a long time and now it s in a
    bad situation.

    The Press serving of the "South Caucasian railway" informs that 57
    wagons of bread-stuff are waiting in the territory of Georgia to
    left for Armenia. 12 colleagues of the "South Caucasian railway"
    left for Georgia to take part in the reconstruction works of the
    bridge. According to the got information about 1-2 weeks will be
    required for recovering the bombarded bridge.
Working...
X