Announcement

Collapse
No announcement yet.

330 Thousand Square Meters Covered With Asphalt In Yerevan In First

Collapse
X
 
  • Filter
  • Time
  • Show
Clear All
new posts

  • 330 Thousand Square Meters Covered With Asphalt In Yerevan In First

    330 THOUSAND SQUARE METERS COVERED WITH ASPHALT IN YEREVAN IN FIRST 8 MONTHS OF 2008

    Noyan Tapan
    http://www.nt.am/news.php?shownews=117617
    Se p 22, 2008

    YEREVAN, SEPTEMBER 22, NOYAN TAPAN. Asphalt laying (330 thousand sq.m)
    and crack filling work, as well as repairs of streets and pavements was
    done in Yerevan in the first eight months of 2008. The deputy mayor
    of Yerevan Vano Vardanian said at the September 22 press conference
    that reinforcement of eight third-degree accident prone buildings
    was completed in the indicated period, and reinforcement of another
    two will finish in late September.

    In his words, 15 city bridges were repaired with 70 million drams
    (233.3 thousand USD) allocated from the state budget. Tram lines
    in Malatia-Sebastia and Bagratunyats Streets were dismantled this
    year, and asphalt laying (250 thousand sq.m) and crack filling (125
    thousand linear meters) was done in these streets. Construction of
    a 83 linear meter breast-wall of the Hrazdan River was completed,
    thanks to which the residents of the houses near the river will not
    have problems after floods.

    Major repairs of the outdoor lighting networks in 17 streets of
    Yerevan will finish in October.

    V. Vardanian announced that 419 elevators were repaired in the city
    in the first quarter of 2008 and 719 ones in the second quarter. It
    is planned to finish repairs of 2,464 elevators by October.
Working...
X