Announcement

Collapse
No announcement yet.

Design For Rehabilitation Of Ararat Valley Drainage System Contract

Collapse
X
 
  • Filter
  • Time
  • Show
Clear All
new posts

  • Design For Rehabilitation Of Ararat Valley Drainage System Contract

    DESIGN FOR REHABILITATION OF ARARAT VALLEY DRAINAGE SYSTEM CONTRACT SIGNED

    armradio.am
    20.02.2009 15:59

    The Millennium Challenge Account - Armenia SNCO announced the award
    of a consulting contract to the joint venture consortium of GITEC
    Consult GmbH (Germany) in association with HGSN Ltd (Armenia). The
    consortium will provide consulting services for the design solutions
    for rehabilitation of Ararat Valley Drainage System under the
    MCA-Armenia Irrigated Agriculture Project Infrastructure Activity.

    The contract was signed at the MCA-Armenia office on February 20, 2009
    by Mr. Ara Hovsepyan, MCA-Armenia CEO and Mr. Wolfgang Jendrischewski,
    Director of Water Resources and Sanitary Engineering Department of
    GITEC Consult.

    The contract includes analysis of the ecological situation, hydrology,
    surface and subsurface horizontal drainage systems and wells in the
    Ararat Valley, social and health assessment, as well as designer's
    field supervision.

    The contract value is $998,243, and will last 31 months, including
    17 months for design activities and 14 months for field supervision.
Working...
X