Announcement

Collapse
No announcement yet.

10,5% Increase Of Power Generation By 'Sevan-Hrazdan Cascade' CJSC I

Collapse
X
 
  • Filter
  • Time
  • Show
Clear All
new posts

  • 10,5% Increase Of Power Generation By 'Sevan-Hrazdan Cascade' CJSC I

    10,5% INCREASE OF POWER GENERATION BY 'SEVAN-HRAZDAN CASCADE' CJSC IN 2008

    ArmInfo
    2009-01-26 13:05:00

    ArmInfo. "Sevan-Hrazdan Cascade" CJSC increased power generation in
    2008 by 10,5% to 576,2 mln kWh as compared with 2007, "International
    Energy Corporation" CJSC, which operates HPP Cascade and belongs to
    "Inter RAO UES", told ArmInfo.

    According to the source data, growth of power generation is connected
    with increase of flushes from Sevan lake for irrigation, which flow
    through HPP Cascade. Electric supply to the power system of Armenia
    grew to 566,9 mln kWh against 512,4 mln kWh in 2007. To note, the
    property complex of "International Energy Corporation" includes seven
    hydropower plants located on Hrazdan river. The cumulative installed
    capacity of the Cascade equals 561,4 MW that makes up about 20%
    of the total generating capacities of Armenia.
Working...
X